|
|
|
|
Welcome to Petroleum Geology Forums
This is a free online community that aims to bring petroleum professionals and geologists together and share valuable knowledge. Registration is easy so become a member now for instant free access.
- Petroleum Geologists can stay up to date with industry related topics and exchange ideas and concepts.
- Upstream Oil and Gas Consultants get a chance to share their expertise and gain exposure to land future projects.
- Geology students and graduates can join the discussion and get into contact with potential future employees.
|
|
|
Petroleum Geology AcronymsBrowse through the Acronyms using the letters above or search for the acronym or it's description using the form below. If you have a acronym or abbreviation you would liek to see in this list please contact us.
|
|
Acronym |
Full Name |
WF1T |
Filtered Waveform 1, 2-inch Averaged |
GOBO |
Good Bond |
PVTV |
Pvt_vol for rci |
SNDC |
Smoothed Near Detector ONLY Porosity (Dolomite Matrix-Caliper Corrected) |
ECHOE |
Amplitude of echo train |
SNBD |
Smoothed Near Detector Only Bulk Density |
M2C3 |
2 foot vertical resolution matched cond. - DOI 30 inch |
NPLX |
Neutron Porosity Limestone, Borehole Corrected, Transmitted |
RUK |
Ratio of curves U/K |
ARTK |
ARC Resistivity Samples |
PERB |
PEF Ratio, Bottom Quadrant, Real-Time |
TE3 |
Time between echos in third data packet |
P16H |
ARC Phase Shift Resistivity 16 inch Spacing at 2 MHz, Environmentally Corrected |
AMP_DIST |
Amplitude Distribution |
M4R1 |
4 foot vertical resolution matched res. - DOI 10 inch |
CHR1 |
Label Peak Coherence, Receiver Array - Lower Dipole |
AHMC |
Array Induction Mud Resistivity Electronically Calibrated |
WF8N |
Waveform 8 Normalization Factor |
KBFV |
Permeability from CMR BFV Log |
VCL_HILT |
Volume of Clay type Material relative to Total Volume from HILT Lithology Computation |
MCBW |
MRIL clay bound porosity (3 bins of TP) |
RLA1 |
Apparent Resistivity from Computed Focusing Mode 1 |
M4R2 |
4 foot vertical resolution matched res. - DOI 20 inch |
TABR |
Time After Bit for Resistivity Measurement |
CR2 |
Best Bin Standoff Correction (Real-time only) |
|
|
|
|
|
|