Acronym |
Full Name |
RPCSL |
Resistivity Phase Diff Compensated Borehole Corrected Short 400kHz |
TRMTT03 |
Monopole multiplex first arrival time |
APDC |
APS Near/Array Corrected Dolomite Porosity |
DMRP |
Density - Magnetic Resonance Porosity |
AQABN |
Array Induction Quality Control Borehole Corrected Non-Filtered Array Signal |
AHMC |
Array Induction Mud Resistivity Electronically Calibrated |
PEIM |
Photoelectric Factor Image, Quadrant |
HBHK |
HNGS Borehole Potassium Concentration |
HEND_RT |
Near Helium Bank Total Counts, Real-Time |
CHTP |
Label Peak Coherence, Transmitter Array, Compressional - Monopole P&S |
CIRM |
Raw medium induction conductivity |
QPN2 |
Acoustic pick quality curve |
SPLC |
Smoothed CNP (Limestone Matrix-Caliper Corrected) |
LSW |
HRDD Calibrated Count Rate (Array) of Gamma Rays from Long Spacing Device |
AFTC |
APS Thermal Detector Count Rate |
LINV |
Length Of Invasion |
TTTA |
Transit Time at Compressional Peak for the Transmitter Array |
NUCP |
Smoothed Neutron Porosity (LS, SS, or DOL) With Subsequent Formation Salinity, Temperature, and Pressure Corrections Applied |
RSFL |
Spherically Focused Resistivity |
TT |
Interval Transit Time |
RIPD |
Deep induction resistivity |
TRAA |
Thermal Neutron Ratio, Real-Time |
ELTH4 |
MRIL the length of fourth echo data packet |
P34H_UNC |
ARC Uncorrected Phase Shift Resistivity for 34 inch Spacing at 2 MHz |
RN5 |
Normal resistivity curve from V8 and F9A |