Acronym |
Full Name |
HART |
True Formation Resistivity from HALS/MCFL Measurements |
IDTF |
Integrated DTDF over Depth |
LTT2 |
Long Spacing Transit Time 2 |
SPSD |
SP from electrode sub processed downhole |
M4R2 |
4 foot vertical resolution matched res. - DOI 20 inch |
AMCO_RT |
Amplitude at Compressional Peak, Real-Time |
LLDT |
Value of LLD Which Would Have Been Read if Results Were Good |
CILD |
Deep induction conductivity |
FCN |
Formation Factor from CNC |
NRBM |
Neutron Porosity Ratio Base, Memory |
LLRM |
Computed mud resistivity |
UL |
Volumetric Photoelectric Factor, Left |
HRD2 |
Long Spaced Density Spectrum Countrate 200 - 540 KeV |
AMRA |
Amplitude at Compressional Peak for the Receiver Array |
DTT |
Interval transit time for transmitter array |
DPLM |
Density Porosity Limestone, Memory |
M2R2 |
2 foot vertical resolution matched res. - DOI 20 inch |
AFRI |
Array Induction Four Foot Radial Resistivity Image |
TNPB_RT |
Thermal Neutron Porosity, Bottom, Real-Time |
MBW |
Bound water - capillary and clay bound |
H1EP |
APS High Resolution Array-1 Detector Count Rate |
NPL |
Enhanced Thermal Neutron Porosity in Selected Lithology |
EYD |
Phase avg'd amp of channel 2 (imag) portion of echo train |
PO10B |
Partial porosity from MRIL (single element) |
KTIM |
CMR Permeability computed using Timur/Coates model |