|
|
|
|
Welcome to Petroleum Geology Forums
This is a free online community that aims to bring petroleum professionals and geologists together and share valuable knowledge. Registration is easy so become a member now for instant free access.
- Petroleum Geologists can stay up to date with industry related topics and exchange ideas and concepts.
- Upstream Oil and Gas Consultants get a chance to share their expertise and gain exposure to land future projects.
- Geology students and graduates can join the discussion and get into contact with potential future employees.
|
|
|
Petroleum Geology AcronymsBrowse through the Acronyms using the letters above or search for the acronym or it's description using the form below. If you have a acronym or abbreviation you would liek to see in this list please contact us.
|
|
Acronym |
Full Name |
FIEL |
Formation factor from CDPI |
DTMN |
Minimal delta-t |
OF1 |
Average DC offset of frequency1 noise |
TNPL |
Thermal Neutron Porosity, Left |
NPBM |
Neutron Porosity Base, Memory |
DPHZ |
HRGD Standard Resolution Density Porosity |
EPHI |
Electromagnetic Propagation Porosity |
CMLL |
Conductivity from RMLL |
AF30 |
Array Induction Four Foot Resistivity A30 |
RPCDSL |
Resistivity Phase Diff Compensated Borehole, Dielectric and Inversion Corrected Short 400kHz |
ATSWI |
Array Induction Two Foot Radial Water Saturation Image |
LLHS |
High Resolution Laterolog Shallow Resistivity |
SPSF |
Smoothed CNP (Sandstone Matrix-Fixed Hole Size) |
LOG_T2CUTOFF |
Logarithmic T2 Cutoff |
SPLC |
Smoothed CNP (Limestone Matrix-Caliper Corrected) |
COND |
Induction conductivity |
NB3 |
Worst Bin Near Detector Only Bulk Density |
P22H_UNC |
ARC Uncorrected Phase Shift Resistivity for 22 inch Spacing at 2 MHz |
FDC |
Formation Factor from PORDC |
CORP |
Density Correction Plus |
FP3 |
Worst Bin Far Detector Only Photoelectric Absorption Factor |
ISTA |
Sonic Time of Acquisition |
SBD2 |
Smoothed Best Bin Bulk Density-Compensated |
PERM(2) |
Relative permittivity of fluid sample |
DTR |
Interval transit time for receiver array |
|
|
|
|
|
|