|
|
|
|
Welcome to Petroleum Geology Forums
This is a free online community that aims to bring petroleum professionals and geologists together and share valuable knowledge. Registration is easy so become a member now for instant free access.
- Petroleum Geologists can stay up to date with industry related topics and exchange ideas and concepts.
- Upstream Oil and Gas Consultants get a chance to share their expertise and gain exposure to land future projects.
- Geology students and graduates can join the discussion and get into contact with potential future employees.
|
|
|
Petroleum Geology AcronymsBrowse through the Acronyms using the letters above or search for the acronym or it's description using the form below. If you have a acronym or abbreviation you would liek to see in this list please contact us.
|
|
Acronym |
Full Name |
TRYST02 |
Y-axis dipole multiplex waveform start time |
HAUD |
12 Raw Deep Resistivities before environmental corrections |
BULK_MOD |
Bulk Modulus |
SNLC |
Smoothed Near Detector ONLY Porosity (Limestone Matrix-Caliper Corrected) |
EHGR |
High Resolution Corrected Gamma Ray |
RHOL5_RT |
Long Spacing Bulk Density(5-Dpoint Mode), Real-Time |
EC11FD |
MRIL filtered echo train packet 1 real |
GR2CM |
Gamma Ray from Detector 2, Borehole Corrected, Memory |
STE |
Coherent Stoneley Energy |
HNDP |
High Resolution Enhanced Resolution Density Porosity |
NPSX |
Neutron Porosity Sandstone, Borehole Corrected, Transmitted |
NPSM |
Neutron Porosity Sandstone, Borehole Corrected, Memory |
AHT10 |
Array Induction Two Foot Resistivity A10 |
RG1B |
Ringing vector amplitude of frequency1 |
TYXGN01 |
Y-x multiplex waveform gain |
PE |
Photo Electric Cross-Section |
CLLD |
Deep conductivity from RD |
TRMGN06 |
Monopole multiplex waveform gain |
NRAT |
DSN (NDSN/FDSN) Ratio |
BNPU |
Neutron Borehole Invariant Porosity, Upper Half |
DI |
Diameter of Invasion |
EYD |
Phase avg'd amp of channel 2 (imag) portion of echo train |
STTA |
Slowness Time Projection, Transmitter Array |
BFV |
Bound Fluid Volume |
SET2 |
Set line 2 pressure (used with RTHB) |
|
|
|
|
|
|