Acronym |
Full Name |
RACVH |
Resistivity Attenuation Compensated Borehole and Inversion Corrected Long 2MHz |
ZENIC |
Integrated Bulk Density from ZDNC |
DTCC |
Delta-T Compressional with Coherence Cutoff |
FHP4 |
HP Pressure FTPR Format |
PELC |
Pe Long Compensated |
M1R9 |
1 foot vertical resolution matched res. - DOI 90 inch |
SFAN4 |
Surface pick first arrival time, T2R1 |
ROSA |
Short Spacing Bulk Density, Real-Time |
SFDC |
Smoothed Far Detector ONLY Porosity (Dolomite Matrix- Caliper Corrected) |
M4R1 |
4 foot vertical resolution matched res. - DOI 10 inch |
SCOR |
Smoothed Standoff Correction |
TCMR_SIG |
Standard Deviation of Total CMR Porosity |
NRBM |
Neutron Porosity Ratio Base, Memory |
DNPH |
Difference between Corrected Thermal Neutron Porosity and Uncorrected |
TXXST10 |
X-x axis dipole multiplexed waveform start time |
BCDT |
Borehole Compensated Delta-T |
RSOZ |
MCFL Resistivity Standoff Standard Resolution |
TXXST01 |
4 component dipole x-x multiplex waveform start time |
PO6 |
Partial porosity from MRIL (single element) |
DRHM |
Delta Rho - Density Correction, Memory |
CMRP_SL |
CMR Porosity - Station Log |
AHOSHI |
Array Induction One Foot Radial Hydrocarbon Saturation Image |
TYYGN10 |
Y-y axis dipole multiplexed gains |
TNPU |
Thermal Neutron Porosity, Up |
TCMR_MW |
Total CMR Porosity - Multi Wait |