Lilis Energy Kudu No. 2H reaches 1,475 boe/d
OGJ Exploration NewsReporting on wells in the Permian basin, Lilis Energy Inc., San Antonio, said its Kudu No. 2H reached a 24-hr initial production rate of 1,475 boe/d on a three-stream basis, at 299 boe/d/1,000 ft. The well is currently producing at 75% liquids on a three-stream basis.
Read more