|
|
|
|
Welcome to Petroleum Geology Forums
This is a free online community that aims to bring petroleum professionals and geologists together and share valuable knowledge. Registration is easy so become a member now for instant free access.
- Petroleum Geologists can stay up to date with industry related topics and exchange ideas and concepts.
- Upstream Oil and Gas Consultants get a chance to share their expertise and gain exposure to land future projects.
- Geology students and graduates can join the discussion and get into contact with potential future employees.
|
|
|
Petroleum Geology AcronymsBrowse through the Acronyms using the letters above or search for the acronym or it's description using the form below. If you have a acronym or abbreviation you would liek to see in this list please contact us.
|
|
Acronym |
Full Name |
NNDM |
Neutron Porosity Data Density, Memory |
SFDC |
Smoothed Far Detector ONLY Porosity (Dolomite Matrix- Caliper Corrected) |
CWV3 |
Acoustic multiplex waveform |
M2CX |
2 foot vertical resolution matched cond. - DOI 120 inch |
AMTE_SL |
Averaged Mud Temperature |
CDPL |
Conductivity derived porosity from RD |
RAAH |
Resistivity Attenuation Compensated Apparent Long 2MHz |
ERTH |
Error Thorium |
TNWV10 |
Acoustic multiplex waveform |
ROBU |
Bulk Density, Up |
SIGB |
APS Borehole Capture Cross-Section |
ROMT |
Maximum Bulk Density |
P34H_UNC |
ARC Uncorrected Phase Shift Resistivity for 34 inch Spacing at 2 MHz |
SPSD |
SP from electrode sub processed downhole |
QN |
Near Quality |
GRCO |
Natural Gamma Corrected |
A28H |
ARC Attenuation Resistivity 28 inch Spacing at 2 MHz, Environmentally Corrected |
NPEM |
Neutron Porosity Time Since Drilled, Memory |
AFRI |
Array Induction Four Foot Radial Resistivity Image |
AHTVM |
Array Induction Two Foot Volume Mud Filtrate |
FPLC |
APS Near/Far Corrected Limestone Porosity |
CBF5 |
CMR Bound Fluid Volume for T2 Cutoff 5 |
RPA |
Resistivity Phase Difference Apparent |
RAASL |
Resistivity Attenuation Compensated Apparent Short 400kHz |
ABFR |
Array Induction Quality Control Borehole Formation Ratio |
|
|
|
|
|
|