Welcome to Petroleum Geology Forums

This is a free online community that aims to bring petroleum professionals and geologists together and share valuable knowledge. Registration is easy so become a member now for instant free access.
  • Petroleum Geologists can stay up to date with industry related topics and exchange ideas and concepts.
  • Upstream Oil and Gas Consultants get a chance to share their expertise and gain exposure to land future projects.
  • Geology students and graduates can join the discussion and get into contact with potential future employees.

  >> Register Now



A B C D E F G H I J K L M N O P Q R S T U V W X Y Z


Petroleum Geology Acronyms


Browse through the Acronyms using the letters above or search for the acronym or it's description using the form below. If you have a acronym or abbreviation you would liek to see in this list please contact us.

Search for Acronyms: 
Search for keywords:
Place + in front of a word which must be found and - in front of a word which must not be found. Put a list of words separated by | into brackets if only one of the words must be found. Use * as a wildcard for partial matches.
Search for all terms or use query as entered
Search for any terms
  

 
Some Random Acronyms 
Acronym Full Name
ATE2 Downhole Head Tension
TYXST10 Y-x axis dipole multiplexed waveform start time
NRBM Neutron Porosity Ratio Base, Memory
RACV Resistivity Attenuation Borehole and Inversion Corrected
EN2D Vector amplitude of inter echo noise of frequency2
RLSI Long Spacing Bulk Density Image, 0.1 ft, 16-Sector
HDRH High Resolution Density Correction
SHSI Smoothed Rapid Sampling Hole Size Indicator
HCSC HNGS Formation Cesium Concentration in pCi/g
DTC Delta-T Time Corrected
LSA4 Long Spacing Sonic Amplitude 4
AT30 Array Induction Two Foot Resistivity A30
SFXN Smoothed Neutron Formation Exposure Time
TRDGN01 Dipole multiplex waveform gain
RACL Resistivity Attenuation Compensated Borehole Corrected Long 400kHz
RPA Resistivity Phase Difference Apparent
TRMST06 Monopole multiplex waveform start time
EYD Phase avg'd amp of channel 2 (imag) portion of echo train
AO30 Array Induction One Foot Resistivity A30
SFDF Smoothed Far Detector ONLY Porosity (Dolomite Matrix-Fixed Hole Size)
P16H ARC Phase Shift Resistivity 16 inch Spacing at 2 MHz, Environmentally Corrected
AC Acoustic
CPON Pressure 1s digit (calibrated)
RES_MIC Microresistivity
ROBU Bulk Density, Up



Content on EPGeology.com is intended for personal use only and to supplement, not replace, professional judgment. EPGeology.com disclaims any and all liability for your use of its content. As most of our content is supplied by our users we can not check copyright, and stress that copyright remains at the original owner. If you suspect copyright infringement please use the contact form to report it.
Contact || © EPGeology.com. || Powered by phpBB Asteroid Mining

phpBB SEO