Acronym |
Full Name |
PCAL |
Caliper from Phase Shift Imbalance |
AHTRI |
Array Induction Two Foot Radial Resistivity Image |
RLA2 |
Apparent Resistivity from Computed Focusing Mode 2 |
T4PL |
Dielectric Propagation Time |
RPCSL |
Resistivity Phase Diff Compensated Borehole Corrected Short 400kHz |
HBDC |
High Resolution Bulk Density Correction |
PTMP |
HP probe temperature |
CPP |
Crossplot Porosity from PORD and CNC |
SCOR |
Smoothed Standoff Correction |
AHTSWI |
Array Induction Two Foot Radial Water Saturation Image |
CHCO_RT |
Coherence at Compressional Peak, Real-Time |
TNST11 |
Monopole multiplex waveform start time |
ATD2 |
Array Induction Two Foot Outer Diameter of Invasion (D2) |
LQSS |
Short-Spaced Quality Indicator |
RXRU |
MCFL Main Resistivity Uncalibrated |
HNDP |
High Resolution Enhanced Resolution Density Porosity |
TNPL |
Thermal Neutron Porosity, Left |
OF2E |
Average DC offset of frequency2 noise |
DTCC |
Delta-T Compressional with Coherence Cutoff |
PSR |
Compensated Phase Shift Resistivity |
NPDM |
Neutron Porosity Dolomite, Borehole Corrected, Memory |
GRTX |
Time Since Drilled from Gamma Ray, Transmitted |
CBP8_SL |
CMR Bin Porosity 8 - Station Log |
CHCO |
Coherence at Compressional Peak Computed Downhole |
CIRD |
Raw deep induction conductivity |