|
|
|
|
Welcome to Petroleum Geology Forums
This is a free online community that aims to bring petroleum professionals and geologists together and share valuable knowledge. Registration is easy so become a member now for instant free access.
- Petroleum Geologists can stay up to date with industry related topics and exchange ideas and concepts.
- Upstream Oil and Gas Consultants get a chance to share their expertise and gain exposure to land future projects.
- Geology students and graduates can join the discussion and get into contact with potential future employees.
|
|
|
Petroleum Geology AcronymsBrowse through the Acronyms using the letters above or search for the acronym or it's description using the form below. If you have a acronym or abbreviation you would liek to see in this list please contact us.
|
|
Acronym |
Full Name |
AMC8 |
AMS Channel # 8 |
ATTL |
Time Since Drilled from MPR Attenuation 400kHz |
UR |
Volumetric Photoelectric Factor, Right |
SHE |
Coherent Shear Energy |
HFSC |
APS High Resolution Near/Far Corrected Sandstone Porosity |
TRMTT05 |
Monopole multiplex first arrival time |
DT24.S |
Interval transit time over 24 inch interval (first break) |
HFCR |
APS High Resolution Thermal Detector Count Rate |
WFI2 |
Waveform Image 2 |
CTBR |
Conductivity from RTBR |
PERM(1) |
NMR Permeability |
SFLF |
Smoothed Far Detector ONLY Porosity (Limestone Matrix-Fixed Hole Size) |
RPRX |
Proximity resistivity |
RWAD |
Apparent Formation Water Resistivity, F from FD |
CHR2 |
Label Peak Coherence, Receiver Array - Upper Dipole |
PDD |
Data Density from Phase Difference |
TBRM |
Mud resistivity from rmudtmp2_0 pfn |
CBF4 |
CMR Bound Fluid Volume for T2 Cutoff 4 |
ITT |
Integrated Transit Time |
AT90 |
Array Induction Two Foot Resistivity A90 |
KTH |
Potassium Yield (KAPI) plus Thorium Yield (THAPI) |
SPLF |
Smoothed CNP (Limestone Matrix-Fixed Hole Size) |
BDCM |
Bulk Density Compensated, Memory |
HEND_RT |
Near Helium Bank Total Counts, Real-Time |
DTC |
Delta-T Time Corrected |
|
|
|
|
|
|