|
|
|
|
Welcome to Petroleum Geology Forums
This is a free online community that aims to bring petroleum professionals and geologists together and share valuable knowledge. Registration is easy so become a member now for instant free access.
- Petroleum Geologists can stay up to date with industry related topics and exchange ideas and concepts.
- Upstream Oil and Gas Consultants get a chance to share their expertise and gain exposure to land future projects.
- Geology students and graduates can join the discussion and get into contact with potential future employees.
|
|
|
Petroleum Geology AcronymsBrowse through the Acronyms using the letters above or search for the acronym or it's description using the form below. If you have a acronym or abbreviation you would liek to see in this list please contact us.
|
|
Acronym |
Full Name |
AHOVM |
Array Induction One Foot Volume Mud Filtrate |
CDH |
Hole Diameter computed from HALS borehole identification inversion |
DT24.S |
Interval transit time over 24 inch interval (first break) |
NNA |
Average of Near Detectors' Count Rates (Real-Time) |
HDPH |
High Resolution Density Porosity |
DTR |
Interval transit time for receiver array |
RAC |
Resistivity Attenuation Borehole Corrected |
T2LM |
T2 Logarithmic Mean |
DNDM |
Density Data Density, Memory |
SNSC |
Smoothed Near Detector ONLY Porosity (Sandstone Matrix-Caliper Corrected) |
HPHN |
High Resolution Porosity from Enhanced Density |
DRHM |
Delta Rho - Density Correction, Memory |
AHTCO90 |
Array Induction Two Foot Conductivity A90 |
TNRU_RT |
Thermal Neutron Ratio, Up, Real-Time |
DFRM |
Mud resistivity from rmudtmp2_0 pfn |
PEF8 |
HRDD High Resolution Formation Photoelectric Factor |
TPOR |
MRIL total porosity (TP + T2 bin array) |
GRCO |
Natural Gamma Corrected |
PERM(1) |
NMR Permeability |
TNGN06 |
Monopole multiplex waveform gain |
PE |
Photo Electric Cross-Section |
PORDC |
Bulk Density Porosity from DNC |
SW_HILT |
HILT Water Saturation from simple Archie equation |
TFGN06 |
Monopole multiplex waveform gain |
AFD2 |
Array Induction Four Foot Outer Diameter of Invasion (D2) |
|
|
|
|
|
|