Acronym |
Full Name |
RPCDSH |
Resistivity Phase Diff Compensated Borehole, Dielectric and Inversion Corrected Short2MHz |
POR_NET |
Net Porosity |
QP27 |
Acoustic pick quality curve |
AHTD1 |
Array Induction Two Foot Inner Diameter of Invasion(D1) |
LLST |
Value of LLS Which Would Have Been Read if Results Were Good |
LCAL |
Density Caliper |
TNRB |
Thermal Neutron Ratio, Bottom |
CILD |
Deep induction conductivity |
SET2 |
Set line 2 pressure (used with RTHB) |
RILD |
Deep induction resistivity |
M2RX |
2 foot vertical resolution matched res. - DOI 120 inch |
QPN3 |
Acoustic pick quality curve |
CHR2 |
Label Peak Coherence, Receiver Array - Upper Dipole |
DI_HRLT |
HRLT Diameter of Invasion |
AHMF |
Array Induction Mud Resistivity Fully Calibrated |
SDPB_HR |
APS Slowing Down Porosity - Borehole Corrected - High Resolution |
ATSL |
ARC Real-Time Tool Shock Level |
NB3 |
Worst Bin Near Detector Only Bulk Density |
EPHI |
Electromagnetic Propagation Porosity |
RPCV |
Resistivity Phase Difference Borehole Inversion Corrected |
SFXS |
Smoothed Density Formation Exposure Time |
MXSH |
Maximum Labeling Slowness, Shear |
PDER |
Time Since Drilled from MPR Phase Difference |
RXTD |
Ratio of shallow to deep resistivity (RFOC/RILD) |
TNPR |
Thermal Neutron Porosity, Right |