|
|
|
|
Welcome to Petroleum Geology Forums
This is a free online community that aims to bring petroleum professionals and geologists together and share valuable knowledge. Registration is easy so become a member now for instant free access.
- Petroleum Geologists can stay up to date with industry related topics and exchange ideas and concepts.
- Upstream Oil and Gas Consultants get a chance to share their expertise and gain exposure to land future projects.
- Geology students and graduates can join the discussion and get into contact with potential future employees.
|
|
|
Petroleum Geology AcronymsBrowse through the Acronyms using the letters above or search for the acronym or it's description using the form below. If you have a acronym or abbreviation you would liek to see in this list please contact us.
|
|
Acronym |
Full Name |
PO5 |
Partial porosity from MRIL (single element) |
BIT |
Bit Size |
HMCA |
MCFL Averaged Mudcake Thickness From Resistivity |
TW |
Wait time (main process) |
KTIM |
CMR Permeability computed using Timur/Coates model |
DPHU |
Density Porosity from ROBU |
PEL |
Photoelectric Factor, Left |
PTNO |
Pretest Number |
WFI3 |
Waveform Image 3 |
AMRA |
Amplitude at Compressional Peak for the Receiver Array |
QCPOR |
HILT porosity Quality Indicator obtained by comparison between uncorrected and corrected thermal neutron porosity |
TYYGN02 |
4 component dipole y-y multiplex gain |
CWV5 |
Acoustic multiplex waveform |
SPLF |
Smoothed CNP (Limestone Matrix-Fixed Hole Size) |
RACVSL |
Resistivity Attenuation Compensated Borehole and Inversion Corrected Short 400kHz |
QP11 |
Acoustic pick quality curve |
CPUP |
Corrected Phase Shift UP |
EN2D |
Vector amplitude of inter echo noise of frequency2 |
ATVM |
Array Induction Two Foot Volume Mud Filtrate |
GR1CX |
Gamma Ray from Detector 1, Borehole Corrected, Transmitted |
QPN1 |
Acoustic pick quality curve |
P22H_UNC |
ARC Uncorrected Phase Shift Resistivity for 22 inch Spacing at 2 MHz |
TICK_NEU |
Neutron Ticks, 0.1 ft |
RND |
Real-Time CNP (Dolomite Matrix) |
PPT |
User-entered predicted pipe time |
|
|
|
|
|
|