Acronym |
Full Name |
CHR2 |
Label Peak Coherence, Receiver Array - Upper Dipole |
B13 |
B1 magnetic field strength |
RAASH |
Resistivity Attenuation Compensated Apparent Short 2MHz |
AO60 |
Array Induction One Foot Resistivity A60 |
OF1E |
Average DC offset of frequency1 noise |
CBF7_SL |
CMR Bound Fluid Volume for T2 Cutoff 7 - Station Log |
NPL |
Enhanced Thermal Neutron Porosity in Selected Lithology |
FCBR |
MCFL Filtered Resistivity Buttons |
MSFL |
Micro-spherically-focused Resistivity |
AFRT |
Array Induction Four Foot Rt |
M0R3 |
True focused induction resistivity - DOI 30 inch |
ATRT |
Array Induction Two Foot Rt |
CBF6 |
CMR Bound Fluid Volume for T2 Cutoff 6 |
SHSI |
Smoothed Rapid Sampling Hole Size Indicator |
NOIS |
Spectral Noise |
QSDP_HR |
APS Porosity Quality - High Resolution |
NPEX |
Neutron Porosity Time Since Drilled, Transmitted |
CBP1_SL |
CMR Bin Porosity 1 - Station Log |
BFV |
Bound Fluid Volume |
AFSWI |
Array Induction Four Foot Radial Water Saturation Image |
GAIN |
Average amplitude of gc1 and gc2 (vector sum) |
M2R1 |
2 foot vertical resolution matched res. - DOI 10 inch |
ESSZ |
HRDD Reconstruction Error on Short Spacing - Standard Resolution |
RPCDSH |
Resistivity Phase Diff Compensated Borehole, Dielectric and Inversion Corrected Short2MHz |
HPB0 |
Hall Probe Static Magnetic Field |