Acronym |
Full Name |
DTH |
6 inch interval transit time |
AO90 |
Array Induction One Foot Resistivity A90 |
SPLF |
Smoothed CNP (Limestone Matrix-Fixed Hole Size) |
AMTE |
Averaged Mud Temperature |
SDK3 |
Worst Bin Standoff Distance |
TTS4 |
Transit Time High Resolution Short Spacing 4 |
CBF3 |
CMR Bound Fluid Volume for T2 Cutoff 3 |
TTRS |
Label Peak Time, Receiver Array, Shear - Monopole P&S |
TYYGN11 |
Y-y axis dipole multiplexed gains |
EC12FB |
MRIL filtered echo train packet 2 real |
ATR |
CDR Attenuation Resistivity |
RPCVH |
Resistivity Phase Diff Compensated Borehole and Inversion Corrected Long 2MHz |
TYXGN11 |
Y-x axis dipole multiplexed gains |
CBSL |
CBL Amplitude (Sliding Gate) |
DTRS |
Interval transit time for receiver array |
SDK2 |
Best Bin Standoff Distance |
LSW5 |
Raw Long Spacing Window 5 Count Rate |
EN1D |
Vector amplitude of inter echo noise of frequency1 |
RACVSL |
Resistivity Attenuation Compensated Borehole and Inversion Corrected Short 400kHz |
M2R6 |
2 foot vertical resolution matched res. - DOI 60 inch |
HNDP |
High Resolution Enhanced Resolution Density Porosity |
SNSF |
Smoothed Near Detector ONLY Porosity (Sandstone Matrix-Fixed Hole Size) |
DPHR |
Density Porosity from ROBR |
DRHL |
Bulk Density Correction, Left |
VSUC |
Volume of Shale from Uranium |