|
|
|
|
Welcome to Petroleum Geology Forums
This is a free online community that aims to bring petroleum professionals and geologists together and share valuable knowledge. Registration is easy so become a member now for instant free access.
- Petroleum Geologists can stay up to date with industry related topics and exchange ideas and concepts.
- Upstream Oil and Gas Consultants get a chance to share their expertise and gain exposure to land future projects.
- Geology students and graduates can join the discussion and get into contact with potential future employees.
|
|
|
Petroleum Geology AcronymsBrowse through the Acronyms using the letters above or search for the acronym or it's description using the form below. If you have a acronym or abbreviation you would liek to see in this list please contact us.
|
|
Acronym |
Full Name |
WF9D |
Waveform 9 Depth |
RVSRU |
MCFL Shallow Resistivity Uncalibrated |
AHORX |
Array Induction One Foot Rxo |
TRMWV21 |
Acoustic multiplex waveform |
ATD1 |
Array Induction Two Foot Inner Diameter of Invasion(D1) |
EN2B |
Vector amplitude of inter echo noise of frequency2 |
QSGF |
APS Quality of Formation Sigma |
NROM |
Maximum Bulk Density, Enhanced Vertical Resolution |
RPCESL |
Resistivity Phase Diff Compensated Borehole and Dielectric Corrected Short 400kHz |
BNPH_RT |
Neutron Borehole Invariant Porosity, Real-Time |
DEN_GP |
Calibrated Density |
TQST11 |
Monopole multiplex waveform start time |
DPDX |
Density Porosity Dolomite, Transmitted |
GRRTM |
Time Since Drilled from RNT Gamma Ray, Memory |
SGMA0 |
Complex sigma array 0 |
CORP |
Density Correction Plus |
DNEX |
Density Time Since Drilled, Transmitted |
TYXST11 |
Y-x axis dipole multiplexed waveform start time |
SPBR |
SP from bridle electrode processed at surface |
NLIM |
Neutron Phi Lime Matrix |
CHRP |
Label Peak Coherence, Receiver Array, Compressional - Monopole P&S |
RPCVH |
Resistivity Phase Diff Compensated Borehole and Inversion Corrected Long 2MHz |
DT1T |
Delta-T Shear, Transmitter Array - Lower Dipole |
TTIC |
Transit time integration (cumulative) |
AT30 |
Array Induction Two Foot Resistivity A30 |
|
|
|
|
|
|