|
|
|
|
Welcome to Petroleum Geology Forums
This is a free online community that aims to bring petroleum professionals and geologists together and share valuable knowledge. Registration is easy so become a member now for instant free access.
- Petroleum Geologists can stay up to date with industry related topics and exchange ideas and concepts.
- Upstream Oil and Gas Consultants get a chance to share their expertise and gain exposure to land future projects.
- Geology students and graduates can join the discussion and get into contact with potential future employees.
|
|
|
Petroleum Geology AcronymsBrowse through the Acronyms using the letters above or search for the acronym or it's description using the form below. If you have a acronym or abbreviation you would liek to see in this list please contact us.
|
|
Acronym |
Full Name |
PO10C |
Partial porosity from MRIL (single element) |
LLCH |
Corrected High Resolution Resistivity |
HEND_RT |
Near Helium Bank Total Counts, Real-Time |
RN3 |
Normal resistivity curve from V6 |
ECHOF |
Amplitude of echo train |
AC_IMP |
Acoustic Impedance |
NPDX |
Neutron Porosity Dolomite, Borehole Corrected, Transmitted |
TTS3 |
Transit Time High Resolution Short Spacing 3 |
UR |
Volumetric Photoelectric Factor, Right |
DPHZ |
HRGD Standard Resolution Density Porosity |
AOSWI |
Array Induction One Foot Radial Water Saturation Image |
TXYST01 |
X-y axis multiplex waveform start time |
PEF5_RT |
Photoelectric Factor(5-Dpoint Mode), Real-Time |
ATSWI |
Array Induction Two Foot Radial Water Saturation Image |
C1RA |
Peak Coherence - Receiver Array |
M1R2 |
1 foot vertical resolution matched res. - DOI 20 inch |
EN2 |
Vector amplitude of inter echo noise of frequency2 |
ECGR |
Environmentally Corrected Gamma Ray |
DTST |
Delta-T Stoneley - Monopole Stoneley |
SCO3 |
Smoothed Worst Bin Standoff Correction |
AF20 |
Array Induction Four Foot Resistivity A20 |
LSDT |
Long Spacing Delta-T |
RPCV |
Resistivity Phase Difference Borehole Inversion Corrected |
DI |
Diameter of Invasion |
CBF7 |
CMR Bound Fluid Volume for T2 Cutoff 7 |
|
|
|
|
|
|